Update on Library transformation

Work has started on the Sheila Silver Library refurbishment project. The books from the third floor have now been moved onto the ground and the first floor:

  • 651 – 692.3 are now on the ground floor. This includes: Accounting, Management, Advertising and Public Relations
  • 692.4 – 999 are now on the first floor. This includes: Chemical Engineering, Building, Art, Architecture, Photography, Music, Literature, Academic Writing, Geography and Travel and History

If you’re planning a visit, we recommend reading these FAQs first. More information about the refurbishment is available on this page. You can also keep up to date with what’s happening via Twitter @leedsmetlibrary #librefurb

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s